Canal Administration
Project for rehabilitation of Ist Patiala Feeder and Kotla Branch:-
A. Project for rehabilitation of Ist Patiala Feeder and Kotla Branch:-
The share of Punjab from Ravi and Beas is fully utilized by Punjab while Punjab is not utilizing full available share out of river Sutlej. The share of Punjab from Sutlej water is about 57%. As the unutilized water is again distributed next year among partner States, the State of Punjab is losing 43% of unutilized water which can be exclusively used by Punjab. The Sutlej water is mainly carried to the field by Sirhind Canal system and Bhakra Main Line System. The Sirhind Canal has its authorized discharge capacity of 12620 Cs but it is seen that this Canal has never run with discharge more than 11500 Cs. because the system downstream Sirhind Canal cannot take discharge more than 11500 Cs.
Keeping in view the above facts , Canal Administration has prepared the Project for rehabilitation of Ist Patiala Feeder & Kotla Branch by increasing its capacity by 20/10% costing Rs. 123.30 Crores so that the State of Punjab may use its full share of available water which shall result in increase of foodgrain production in Punjab .
Ist. Patiala Feeder could carry a discharge of only 3600 Cs. against authorized discharge of 4010 Cs. . Rehabilitation of Ist Patiala Feeder has been completed during February 2008 and its capacity has been enhanced to 4914 Cs. Similarly Kotla Branch carries only 2550 Cs. against authorized discharge of 3018 Cs. After rehabilitation the capacity of Kotla Branch shall increase to 3304 Cs. The rehabilitation of Kotla Branch has been completed in a length of 37 Kms. during Oct. 2008 . The balance work of rehabilitation in a length of 93 Kms is proposed to be executed during closure of the Canal in October 2009.
The Project is being funded under Accelerated Irrigation Benefit Programme of Govt. of India . Govt. of India is to provide grant of Rs. 30.825 Crores whereas, the balance 92.475 Crores are to be provided by the State. An expenditure of Rs. 53.46 Crore has already been incurred on the Project as on 31.03.2009.
After the completion of the Project, the existing area of 265485 hectare shall get better Irrigation facilities and an additional area of 68624 hectare shall be brought under Command . The Project shall benefit agricultural land located in District Patiala , Sangrur, Mansa, Bathinda, Fatehgarh Sahib etc.
B. Conversion of Banur canal from Non perennial to perennial.
At present Banur Canal is non-Perennial channel. It is proposed to make it perennial by constructing suitable diversion in river Ghaggar near the existing off take point of Banur Canal.
The existing designed capacity of Banur Canal at its Head is 102 Cs. It is proposed to increase the capacity to 130 cs. without any increase in water allowance which is 2.83 cs per thousand acres.
The Project for converting Banur Canal System from non-perennial to perennial costing Rs. 58.15 Crores has been approved by NABARD . NABARD share is Rs. 45.56 Crore & State Share is Rs. 12.59 Crores.
The work of main component of the project i.e. construction of weir across river Ghaggar is under execution and is proposed to be completed soon.
After the completion of the project, about 36000 acre of Agricultural land of 60 villages in district Patiala, Mohali and Fatehgarh Sahib shall be provided better irrigation facilities and about 3000 acre additional area shall be brought under command.
C. Rehabilitation/ Remodeling/ Construction/ Extension of distributaries and Minors:-
Under this scheme remodeling/ construction of Distributories and minors will be under taken to enhance their carrying capacity which with the passage of time has been reduced due to various reason, like increase in co-efficient of rugosity in the various distributories/ Minors. For optimum utilization of the available surface water through the canal network, an efficient and well maintained canal system is of utmost importance. Punjab has made tremendous progress in development of canal network, which presently comprises of about 14500 Km of canals/ distributories/ Minors for utilizing existing water resources. In the 10th plan, an expenditure incurred was Rs. 2742.59 lacs. In the Annual Plan 2006-07 the expenditure incurred was Rs. 2185.00 lacs .
The details of projects is as under:-
Sr. No. |
Name of Project | Estimated Cost.( Rs. In lacs | Name of the Districts benefited/ No. of villages benefited. |
1.
|
Construction of New Lakkarwala, Minor |
18.00
|
Mukatsar /4
|
2.
|
Raising the capacity of Alamwala Distributary System. |
254.00
|
Mukatsar/13
|
3.
|
Raising the capacity of Kasubegu Distributary System |
320.00
|
Ferozepur /30
|
4.
|
Raising the capacity of Link Channel & 2-L Link Channel .
|
124.43
|
Mukatsar/10
|
5.
|
Rehabilitation of Behman distributary system offtaking at RD 389388-R of Bathinda Branch Canal
|
123.71
|
Bathinda /11
|
6.
|
Rehabilitation of Teona distributary system offtaking at RD 447800-L of Bathinda Branch Canal .
|
30.37
|
Bathinda , Mukatsar/33
|
7.
|
Rehabilitation of Raika Feeder System offtaking at RD 448000- of Bathinda Branch Canal .
|
35.00
|
Bathinda Mukatsar/31
|
8.
|
Construction of New Lined Gurusar Minor . |
350.63
|
Faridkot/3
|
9.
|
Construction of New Aulakh Minor . |
30.00
|
Mukatsar/3
|
10.
|
Rehabilitation of Karamgarh Distributary. |
51.00
|
Mukatsar/11
|
11.
|
Rehabilitation of Malout Distributary. |
66.00
|
Mukatsar/13
|
12.
|
Constructing Machaki Kalan Minor RD 0-14459 off taking at RD 42420-R of Mudki Disty .
|
13.00
|
Mukatsar/3
|
13
|
Raising the capacity of Kingwah Disty System.
|
884.02
|
Moga /27
|
14
|
Raising the capacity of Illahiwah Disty. System. |
410.37
|
Moga, Ferozepur/25
|
15
|
Raising the capacity of Zira Disty. System.
|
505.56
|
Moga, Ferozepur/28
|
16
|
Raising the capacity of Raunta Disty. System. |
691.12
|
Moga Bathinda/35
|
17
|
Project estimate ofr lining of Sekhwan sub minor from RD. 15000- 19750 raising
of existing
|
31.24
|
Moga, Ferozepur/2
|
18
|
Project estimate for Rehabilitation of Phul disty system off taking at RD 276425-L of Bathinda Branch canal
|
402.51
|
Bathinda/42
|
19
|
Project estimate for Rehabilitation of Dhapali Disty. system off taking at RD 221570-R of Bathinda Branch Canal
|
464.69
|
Barnala Bathinda/38
|
20
|
Raising the capacity of Aghawah Disty system |
877.36
|
Moga, Ferozepur/27
|
21
|
Raising the capacity of Daulatwah disty System |
679.69
|
Moga, Ferozepur/25
|
22
|
Raising the capacity of Assa Butter disty System |
654.11
|
Faridkot, Mukatsar/52
|
23
|
Project estimate for Rehabilitation of Bathinda disty system off taking at RD 3899388-L of Bathinda Branch Canal |
414.29
|
Bathinda/25
|
24
|
Project estimate for Rehabilitation of Kotkapura disty system
|
529.21
|
Faridkot/27
|
25
|
Project estimate for Rehabilitation of Jaito disty from RD 0 to 78150 |
976.52;
|
Faridkot Mukatsar/38
|
26
|
Extension of 3-R Minor of Mudki Disty RD 27000-49600
|
302.71
|
Faridkot/ 12
|
27
|
Constructing 4-R Mr. RD. 0-18150 off takes at RD 10525/R Golewala (New) |
253.04
|
Faridkot/7
|
28
|
Rehabilitation of low level Machanikalan Minor RD 0-37500 (E.Re)
|
137.40
|
Faridkot/11
|
29
|
Rehabilitation of Lubhaniawali Minor from RD 0-30100 & its extension 30100-44000 |
292.54
|
Mukatsar/10
|
30
|
Project estimate for raising/Rehabilitation of Ghal Disty system from RD. 0- 9700
and its extension
|
138.05
|
Ferozepur/6
|
31
|
Rehabilitation of Manava Minor and Kirmati Minor.
|
213.60
|
Moga, Ferozepur/10
|
32
|
Rehabilitation of Rupana Distributory System
|
777.57
|
Faridkot Mukatsar/24
|
33
|
Project estimate for rehabilitation of Bhana Minor from RD-0- 10492.
|
29.36
|
Faridkot/5
|
34
|
Project estimate for constructing of Gurusar sub Minor from RD 0- 5575 of takinjg RD 15580-/R Jaito Disty.
|
47.21
|
Faridkot/2
|
35
|
Project estimate for providing escape at RD 22500/L Sibian disty and Rehabilitation of this system. |
586.42
|
Faridkot Moga
/17
|
36
|
Project estimate for extension Sandhwan Minor from RD 10720 to 35200 |
755.79
|
Faridkot /5
|
37
|
Project estimate for constructing dhaipai sub Minor from RD 0- 2800 off taking RD 385785/R Abohar Branch. |
65.88
|
Faridkot/1
|
38
|
Project estimate for lining & extension Datewal Disty from RD.0- 27500 off taking from RD. 288728/R Abohar Branch. |
503.13
|
Moga/7
|
39
|
Project estimate for constructing New lined Wara Bhaika sub Minor off taking at RD. 19725/R of Neor Minor.
|
30.59
|
Faridkot/2
|
40
|
Project estimate for rehabilitation and extension of Mari disty system |
373.51
|
Faridkot
Moga/17
|
41
|
Project estimate for constructing Kotkapura Sub Minor RD 0- 1137 off taking RD 40200/L Faridkot Disty. |
61.82
|
Faridkot/2
|
42
|
Project estimate for constructing Romana sub Minor RD 0-6850 off taking RD 383565/L Abohar Branch.
|
79.39
|
Faridkot/2
|
43
|
Project estimate for constructing Didar Singh wala Minor RD 0-10750 off taking RD 29000/L of Raounta Disty.. |
138.49
|
Moga/4
|
44
|
Raising the banks / lining of Golewala Disty |
859.00
|
Ferozepur) Mukatsar) Faridkot)34
|
45
|
Raising the capacity of Dodha disty system |
459.00
|
Faridkot ) Mukatsar)14
|
46.
|
Revised estimate for Construction of New Chauntra Minor . |
296.00
|
Mukatsar/11
|
47
|
Revised estimate for construction of Dohak Minor .( 8 No. Bridges only) |
33.68
|
Faridkot/7
|
48
|
Revised estimate for construction of Behlewala Minor . |
334.91
|
Faridkot,Mukatsar/11
|
49
|
Revised Estimamte for construction of Machaki Kalan Minor (3 No. Bridges) |
12.80
|
Faridkot/3
|
50
|
Construction of 3 R Minor of Golewala Disty System |
741.50
|
Faridkot/12
|
51
|
Raising / Rehabilitation the capacity of Mukatsar disty System |
302.00
|
Mukatsar/ 24
|
52
|
Raising the capacity of Malookpur Disty. System. |
2210.00
|
Ferozepur, Mukatsar/ 55
|
53
|
Project for restoration of Sangatpura distributary system. |
202.00
|
Patiala/12
|
54
|
Rehabilitation of Mudki disty, its off taking 1-R Minor and Machakikalan Minor from Head to tail. |
686.58
|
Faridkot &Mukatsar/25
|
55
|
Project estimate for extension of Khote Minor from RD. 16396 – 34780 |
418.75
|
Moga/5
|
56
|
Project for Rehabilitation & Raising the capacity of Ghuman Disty with 20% enhanced capacity . |
570.18
|
Mansa/26
|
57
|
Project for Rehabilitation & Raising the capacity of Bhikhi Disty with 20% enhanced capacity & changed value of ‘N’.. |
1878.12
|
Mansa/78
|
58
|
Raising the capacity of Bhadaur disty System including New lined Adampura Minor |
3512.00
|
Barnala Bathinda /37
|
59
|
Project for Rehabilitation for Dhudal Disty with 20% enhanced capacity and changed value of ‘N’. |
617.13
|
Mansa/31
|
60
|
Project for Rehabilitation & Raising the capacity of New Fatehpur Minor with 20% enhanced capacity . . |
57.46
|
Mansa/11
|
61
|
Project for Rehabilitation & Raising the capacity of New Fatta Minor with 20% enhanced capacity and changed value of ‘N’. |
33.80
|
Mansa/4
|
62
|
Raising the capacity of Ditch Channel System |
571.00
|
Moga, Faridkot, Ferozepur /32
|
63
|
Project estimate for remodeling/ Reconstructing existing water course off taking
at RD 12530-L
two parts one for water course & other fir sub minor from RD 0 to 6950 ft in district Ferozepur. |
32.00
|
Ferozepur /2
|
64
|
Project estimate for Extension of Matta Minor from RD 21560 to RD 25375 |
22.00
|
Faridkot /5
|
65
|
Project for Rehabilitation & Raising the capacity of B.D. Link System with 20% enhanced capacity . |
255.51
|
Mansa/6
|
66
|
Project for rehabilitation of Budhlada Branch System with 20% enhanced capacity |
1183.41
|
Mansa , Sangrur/45
|
67
|
Project estimate for restoring design capacity of Ghaggar Branch & off taking Distributaries of Ghaggar Branch. |
700.00
|
Patiala & Sangrur/37
|
68.
|
Project for rehabilitation of Sunam Branch offtaking at RD 134496/L of Ghaggar Branch with 20% enhanced capacity |
456.83
|
Sangrur
|
69.
|
Project for rehabilitation of Sunam distributary system offtaking at RD 60700/ Front of Sunam Sub Branch with 20% enhanced capacity |
417.30
|
Sangrur & Mansa
|
70
|
Project for Rehabilitation & Raising the capacity of Pucca Disty. with 20% enhanced capacity . |
354.44
|
Bathinda/22
|
71.
|
Project for rehabilitation of Joga Branch System with 20% enhanced capacity . |
1556.00
|
Mansa , Sangrur/46
|
72
|
Construction of New Dharangwala Minor from RD 0- 23660 off taking at RD 618195/R Abohar Branch ( Balance work RD.5000-23660) |
334.66
|
Mukatsar & Ferozepur/4
|
73
|
Project for rehabilitation of Boha Distributory system offtaking at RD 247750/R of Ghaggar Branch with 20% enhanced capacity |
919.60
|
Mansa /47
|
74
|
Project estimate for constructing new lined Dhelwan Disty RD. 0- 54500 tail off taking RD. 350300/R of Bathinda Branch |
1286.00 |
Bathinda /5 |